Events
05.15.12 Data released to public
11.15.11 End of project and all objectives successfully completed!
10.25.11 Transit flight (R12) to LaRC with coordinated spiral over Wallops AERONET
10.25.11 Science flight (R11) with coordinated spirals over 3 AERONET sites
Marthas Vineyard, Thompson Farm, Harvard Forest)
10.24.11 Science flight (R10) with coordinated spirals over AERONETs
at Marthas Vineyard and Thompson Farm
10.23.11 Transit flight (R09) to Groton, CT, for urban pollution study.
Spiral over Brookhaven, NY, AERONET
10.21.11 Science flight (R08) with coordinated spirals over 3 AERONET sites (COVE, Wallops, LaRC)
10.18.11 Science flight (R07) with coordinated spirals over 3 AERONET sites (COVE, Wallops, LaRC)
10.09.11 Science flight (R06) for B200 only, transit from Asheville, NC, to LaRC
10.09.11 Science flight (R05) with coordinated spiral over Tuscaloosa, AL. UC12 transits to LaRC
10.08.11 Science flight (R04) along CALIPSO ground track and over agricultural fires
10.08.11 Transit flight with data (R03) to Jackson, MS, for smoke measurements
10.04.11 Science flight (R02) along CALIPSO ground track
09.30.11 Successful first science flight (R01) over 3 AERONET sites (COVE, Wallops, LaRC)
09.26.11 Flight Readiness Review
09.01.11 Science Flights Began
08.11.11 ASRB In situ Sensor Suite Review
07.21.11 Critical Design Review
04.01.11 Preliminary Design Review (PDR)
03.10.11 ASRB Remote Sensor Suite Review
03.03.11 Team Meeting with NASAs Science Director Mike Freilich at NASA Langley
02.09-10.11 Project Management Challenge Conference
02.03.11 Aviation Safety Review Board (ASRB) Introductory Briefing
01.18.11 Briefing to HQ
01.11-13.11 4D Training
12.14.10 PI-Neph Technical Interchange Meeting (TIM)
11.05.10 Systems Requirements Review
10.12-13.10 UMBC Technical Interchange Meeting (TIM)
10.07.10 Project Initiation Conference (PIC)
08.15.10 Project Start
|